Industry
SNB: 1.75 MW reduction in grid load
High costs due to reactive power, despite on-site generation.
Faults and outages
Power QualityIdentifying and resolving the causes of faultsEMCIdentifying faults in control and communication systemsReliable installationDiagnosis of critical functions and wear and tearCapacity and grid congestion
Grid congestionFreeing up capacity within your connectionEnergy Management (EMS)Active management within your power limitsEnergy transitionIntegrating solar panels, charging points and heat pumpsNot quite sure what the issue is? An engineer will work with you to find a solution.
View all solutionsA project can begin with any one of these four.
View all servicesWe understand the risks and standards specific to each sector.
View all sectorsWe supply and commission filters, compensation systems and measuring equipment.
View all productsArticles, white papers, sessions and training courses delivered by our engineers.
Open the knowledge baseWe have been working in the fields of power quality, EMC and energy flows since 2007.
Read about HyTEPSSector
In industry, production depends on the electrical installation. Frequency converters, robotics and automation systems cause voltage disturbances and are themselves susceptible to them: faults with no apparent cause, wear and tear, and production stoppages. We analyse the situation and resolve the issues.

Whereas heavy, linear loads used to be the norm, your installation is now dominated by power electronics: LED lighting, variable speed drives, UPS systems and solar panels. These are essential for sustainability and process optimisation.
However, they distort the sinusoidal waveform of the voltage and are, at the same time, susceptible to that very same distortion. This comes at a cost: unplanned downtime, transformers and motors wearing out more quickly due to overheating, and energy loss through reactive current and heat.
Where we start depends on the situation at hand: a fault, an expansion or a new design.
We carry out measurements in accordance with EN 50160 and IEC 61000 and record waveforms, transients and harmonics right up to the highest frequencies.
View the measurementsUsing load flow and harmonic simulations, we predict the impact of an expansion or a solution on your installation.
View the simulationsLoads are constantly changing. With continuous monitoring, you can prevent latent problems from leading to further outages.
View the monitoringMaintenance of filters and capacitor banks, for an environment where every minute of downtime costs money.
View service and maintenanceWhere we carry out measurements in a typical installation, and which products and services are involved. Select an icon for an explanation.
A process plant with its own medium-voltage connection, heavy-duty drives and often a filter or STATCOM. The diagram shows the measurement points and the products installed at those locations.
Measurement · Power Quality-specific
Measure the severity and duration of voltage dips and assess what the equipment can withstand. This will determine what protection is required.
Measurement point: at the point of connection (PCC).
Measurement · Passive components
Measure the capacitance of the capacitors in a filter or capacitor bank. Ageing becomes apparent before the filter goes out of tune.
Measurement point: at the capacitors of the passive filter.
Measurement point · 2 measurements
A bespoke investigation into faults that cannot be explained by standard measurements: more measurement points, a longer duration and analysis of the raw waveforms.
A combined investigation is carried out when a fault cannot be attributed to a single cause. Power quality, high-frequency interference and earthing are measured simultaneously.
Measurement · Radiated EMC
Use remote antennas to measure the interference emitted by an installation, up to 32 GHz.
Measurement point: with a measurement antenna located at a distance from the drives.
Product
A STATCOM supplies or absorbs reactive power within milliseconds. This keeps the voltage stable under rapidly changing loads and improves the power factor.
Product
A capacitor, inductor and resistor tuned together to a single harmonic. The filter absorbs that harmonic current whilst simultaneously supplying reactive power.
Preventing production stoppages and wear and tear on machinery.
Note: this diagram has not yet been reviewed by an engineer.
Measurement · General Power Quality
A week-long measurement campaign at the connection point to assess voltage compliance with EN 50160: voltage level, frequency, harmonics, flicker and imbalance.
Measurement point: at the mains connection.
Measurement point · 2 measurements
Measures harmonic voltages and currents by order and identifies which load is causing the distortion.
Measure how much reactive power the installation requires, and whether the compensation is providing too little or, conversely, too much.
Measurement point · 2 measurements
Measure common-mode voltages and currents. These flow via earth and shielding and interfere with control and communication systems.
Makes the switching frequencies of inverters and power supplies visible in the current and voltage.
Measurement · Power Quality-specific
Detect rapid voltage fluctuations that manifest as flickering lights, and identify the source.
Measurement point: on the power supply to the welding robots.
Measurement · Other measurements
A thermal imaging camera reveals connections, cables and components that are overheating.
Measurement point: on the power supply to presses and furnaces.
Product
Measures the harmonic current of the load and supplies the opposite current. This prevents distortion from spreading to the rest of the installation and the mains supply.
Product
Compensates for reactive power close to the load. Cables and transformers carry less current and the power factor remains within the grid operator’s requirements.
Product
Meters per group show where consumption is occurring and when peaks occur. This forms the basis for achieving savings and for managing energy usage within the connection.
In the report, HyTEPS recommended compensating harmonic currents to us through Active Harmonic Filters because of the varying load. Connecting these to the medium voltage addresses the pollution at source.
After several discussions and specialised measurement, three capacitor banks supplied by HyTEPS were installed at Xella on the advice of HyTEPS. These have now been in operation for six months and we can already conclude that the reactive power in the grid has virtually disappeared.
You can't optimise what you don't measure - thanks to monitoring, our finance, engineering and planning departments now work better together and investments are well supported.
We have known HyTEPS for a long time now. In 2014, they did the first project here on lighting energy savings. We are very satisfied with the cooperation with HyTEPS, especially their expertise and short lines of communication appeal to us.
A big advantage of the MFED is the fact that I don't have to walk to the installation every time to check how everything is. I can now monitor all that accurately remotely. And I can always call on HyTEPS to look at the data together.
The moment equipment fails, such as variable speed drives, electrical power supplies or thyristors, we can immediately see from behind our desk what the status of Power Quality was at that moment, - real-time - but also in the past.
HyTEPS immediately understood what we needed. They not only removed reactive power, but also freed up extra power, and made our power network healthier. We are now looking at how we can potentially release even more power by smart sizing.
Extremely important to ARN is the safety and reliability of our production process. By regularly servicing and maintaining the Active Filters, ARN and HyTEPS keep a close eye on this. HyTEPS thinks along with us and understands our business.
By installing a capacitor bank, we increase operating efficiency and prevent unnecessary losses due to heat generation, among other things.
HyTEPS interpreted our request well and provided optimal support in the process. The delivery of the capacitor bank went smoothly and the given expected results came true.
HyTEPS' proposals were immediately clear and applicable. Their expertise not only helped us operate more safely.
One year after commissioning the HyTEPS capacitor bank, we note that no 'blind power penalty' was paid after installation and that the capacitor bank has already almost paid for itself.
Industry
High costs due to reactive power, despite on-site generation.
Industry
No need for a higher-capacity grid connection to scale up production.
Industry
Sustainability measures have led to harmonic distortion and equipment failure.
Industry
The team is now working on ultra-fast charging, equipped with the appropriate protective gear.
Industry
Monitoring designed to prevent reactive power penalties.
Industry
A new 5 MW installation was not to result in any outages.
Industry
Grid congestion threatened to block the expansion plans.
Industry
Harmonic distortion in the production of precision tubes.
Industry
Monthly fines avoided thanks to a 300 kVA capacitor bank.
Industry
400 kVAr capacitor bank to counteract reactive power.
Industry
Elimination of reactive power penalties and additional capacity with a 150 kVA capacitor bank.
Industry
Measurements revealed unused reserve capacity; a battery system proved unnecessary.
Industry
Reactive power addressed using capacitor banks.
Industry
Unexplained outages in zinc production.
Industry
Specialist measurements at a zinc plant with currents of up to 77,000 A.
Yes. Harmonics can cause cables and transformers to overheat, posing a fire hazard. They can also cause protective devices to trip unintentionally, resulting in sudden machine breakdowns.
This depends on the size and complexity of your installation. The cost of one hour of production downtime is often much higher than that of an assessment. An engineer will provide you with a bespoke estimate.
Yes. We install the measuring equipment whilst your processes continue as normal. In fact, to ensure an accurate analysis, we need a representative load.
Yes. Poor power quality leads to additional heat losses in cables and components. By reducing reactive current and harmonics, you can reduce the load on the installation.
Grid operators are imposing increasingly stringent requirements on the power you feed back into the grid. We assess your installation against the applicable grid code and international standards, and help you avoid fines or disconnection.
Installing a filter or capacitor bank without carrying out measurements is like treating a condition without a diagnosis. In the event of resonance, a capacitor bank can actually amplify harmonic currents. That is why we first identify the source and then select the solution: hybrid compensation, active harmonic filters or voltage stabilisation.
Identifying and resolving the causes of faults and outages.
View Power QualityFree up capacity on your existing connection by eliminating reactive current and interference.
View grid congestionA diagnosis of critical functions, and the solution to match.
View reliable installationsYou’ll receive a reply within one working day. Your first consultation will be with an engineer.
Is it urgent? Call 0492 37 12 12.