
Measurements
On-site, from a quick spot check to a long-term measurement. We assess the data against EN 50160 and IEC 61000 and provide you with an improvement plan.
View measurementsFaults and outages
Power QualityIdentifying and resolving the causes of faultsEMCIdentifying faults in control and communication systemsReliable installationDiagnosis of critical functions and wear and tearCapacity and grid congestion
Grid congestionFreeing up capacity within your connectionEnergy Management (EMS)Active management within your power limitsEnergy transitionIntegrating solar panels, charging points and heat pumpsNot quite sure what the issue is? An engineer will work with you to find a solution.
View all solutionsA project can begin with any one of these four.
View all servicesWe understand the risks and standards specific to each sector.
View all sectorsWe supply and commission filters, compensation systems and measuring equipment.
View all productsArticles, white papers, sessions and training courses delivered by our engineers.
Open the knowledge baseWe have been working in the fields of power quality, EMC and energy flows since 2007.
Read about HyTEPSA project can begin with any of these four steps: a measurement, a simulation, monitoring or maintenance. Which one is suitable depends on your specific requirements.

On-site, from a quick spot check to a long-term measurement. We assess the data against EN 50160 and IEC 61000 and provide you with an improvement plan.
View measurements
We digitally model parts of your installation and simulate various scenarios: harmonics, arcing and selectivity.
View simulations
Monitoring your installation, day and night. You can view trends and remaining capacity, and receive an alert in the event of an anomaly.
View monitoring
Regular inspections and updates extend the service life of filters and measurement systems.
View service and maintenanceWe often deal with urgent enquiries within 24 to 48 hours. Call 0492 37 12 12.
Offshore
Years of cable insulation damage on the Bumblebee.
FMCG
Penalties and capacity shortages caused by reactive power.
Utility & Infra
Precise measurements identified the risks associated with this critical installation.
Industry
Monthly fines avoided thanks to a 300 kVA capacitor bank.
Industry
Grid congestion threatened to block the expansion plans.
Industry
The team is now working on ultra-fast charging, equipped with the appropriate protective gear.
Utility & Infra
Arc flash study for a 14,000 kWh battery system.
Grid operators
Bespoke software transforms the data stream into actionable control information.
Utility & Infra
Active harmonic filters for installation in Hangar 14.
You’ll receive a reply within one working day. Your first consultation will be with an engineer.