Why attend this event?

The energy transition is putting unprecedented pressure on the power grid. For you as a wholesale consumer, this often means that expanding, making more sustainable or electrifying suddenly seems impossible. The grid operator is selling 'no' for a heavier connection, and waiting lists are years long. The automatic reflex then often is to immediately invest in expensive battery systems. But is that really the only, or the best solution?

During this Power Topic, we will show that, in practice, your contract power is often NOT the hard limit of your technical capabilities. Many installations use their contracted power inefficiently due to internal contamination and invisible losses. We will discuss how you can free up hidden capacity yourself by optimising your current installation.

What will be covered?

  • The myth of the full grid: Why the physical limit of your connection has often not yet been reached, even if you get "no" from the grid operator.
  • Unlocking hidden capacity: How 'lost' power due to reactive current and harmonic contamination fills your cables and transformers unnecessarily, and how we solve it.
  • Measuring is knowing: The concrete steps HyTEPS takes to achieve an efficient solution. Once we have your Power Quality and actual consumption mapped, we look at the optimal integration of solutions.
  • Case studies: We discuss concrete customer cases where we created extra space without any grid reinforcement or battery involved.

Who is this event for?

This session is indispensable for professionals who need to respond strategically and technically to power grid constraints:

This event is indispensable for:

  • Installation Supervisors (IV) and Technical Managers
  • Facility managers and operators of heavy electrical infrastructure
  • Sustainability managers and energy transition project leaders
  • Company directors and executives with expansion plans

Speaker

Christan van Dorst

Christan van Dorst is technical director at HyTEPS. During this lecture, he will take you through the physics of electricity and explain how, with the right components, you can directly reduce your grid load.

Practical information

  • Cost: Participation is free of charge. We believe in sharing knowledge to make the market safer.
  • Capacity: There is room for a maximum of 30 participants to ensure interactivity. Full is full.

Application form

Want to be sure of insight into the future of your installation? Fill in the form below. Due to the limited number of places (30), we recommend registering early.