29 December 2025

550 Amp released power: from capacity problem to growth space

Nijsen was struggling with high costs and lack of capacity due to reactive power. Our active capacitor banks eliminated the penalties and immediately created 550 amps of extra space on the transformers.

Read more
18 December 2025

Sustainable expansion without grid reinforcement at Clondalkin Flexible Packaging

HyTEPS ensures continuity at Clondalkin with a system that combines energy insight with automatic HACCP recording. This eliminates risky manual checks and maximises operational reliability.

Read more
18 December 2025

Full operational reliability through elimination of grid contamination at Sappi Maastricht

Sappi Maastricht eliminated costly production downtime by targeting harmful harmonics with a Power Quality diagnosis and active filtering. This investment fully restored operational reliability and paid for itself within a year due to the guaranteed continuity.

Read more