29 April 2026

100% Proactive Reliability for the Eastern Scheldt storm surge barrier

For absolute operational reliability of the Eastern Scheldt storm surge barrier, our engineers carried out a proactive Power Quality analysis on behalf of Heijmans. Through strategic measurements, we mapped the electrical installation, preventing potential problems and ensuring that this crucial Delta work is always ready.

Read more
15 April 2026

Halving harmonic contamination increases operational reliability at Thialf

Thialf was struggling with unexplained failure of critical variable speed drives. HyTEPS implemented Active Harmonic Filters, which successfully reduced the harmonic pollution (THDu) present to below 4%. Supplemented by permanent monitoring, this now ensures an extremely stable and reliable installation.

Read more
29 December 2025

Continuity in passenger flows through EMC control

Harmonic contamination threatened the continuity of Schiphol's security lanes. HyTEPS analysed the risks and installed seven active filters to restore grid quality. The result is a stable installation and guaranteed operational security for millions of passengers.

Read more
29 December 2025

75% Faster shutdown times for safe battery storage at iwell

For iwell's battery system, HyTEPS conducted an Arc Flash Compliance study to ensure electrical safety. The new settings reduced shutdown times by 75%, reducing dangerous arc flash energy to safe levels.

Read more
19 December 2025

Rijkswaterstaat ensures tunnel safety with 40% spare capacity

HyTEPS eliminates harmonic pollution in the Ruhr Tunnel by implementing four active filters. Thanks to 40% spare capacity, technical safety for Rijkswaterstaat is guaranteed under all circumstances.

Read more
18 December 2025

100% operational reliability for taxiway lighting at Schiphol Airport

HyTEPS identified the risks to the taxiway lighting at Schiphol Airport through accurate measurements. With the subsequent solution, the continuity and safety of this critical installation is fully guaranteed.

Read more
18 December 2025

4MW solar panels integrated without grid pollution at KLM

HyTEPS integrated 4 MW of solar panels at KLM Schiphol without risk. By eliminating grid pollution with Active Harmonic Filters, we ensure maximum operational reliability and a stable installation in Hangar 14.

Read more
18 December 2025

Fault-free LED transition for De Kuip stadium

In an environment where tens of thousands of spectators count on continuity, downtime is not an option. HyTEPS secures Power Quality at Stadion Feijenoord, so that the transition to LED lighting leads directly to guaranteed performance without invisible risks.

Read more
17 December 2025

Communication stability ensured by elimination of EMI at Schiphol Airport

HyTEPS eliminated electromagnetic interference in the Schiphol T2000 network after an integral EMC study. This approach restored system integrity and guaranteed uninterrupted communication for emergency services.

Read more