Unnecessary energy losses and high costs due to reactive power were blocking the sustainability ambitions of Slibverwerking Noord-Brabant (SNB). We transformed this technical challenge into a commercial success: more capacity on the existing plant and a payback period of less than 12 months.
At SNB, the largest sludge processor in the Netherlands, downtime is not an option and sustainability is key. The organisation converts biogas from sludge processing into energy and invested in a 5MW solar farm to fully meet its own energy needs. However, this sustainable ambition was threatened by an invisible but costly problem: reactive power. Despite their own generation, SNB was struggling with sky-high monthly costs on energy bills. They bought too few active kilowatts, but heavily loaded the grid with reactive power.
This technical phenomenon not only resulted in unnecessary financial losses but also placed an unnecessarily heavy burden on the grid operator’s transmission capacity. The person responsible for the installation faced a dilemma: how can we get more out of the existing infrastructure without costly grid upgrades? The fear of fines and the inefficient use of their green investments called for a specialist diagnosis. As the situation at SNB demonstrated: sustainable generation serves little purpose if internal power quality issues consume the capacity.

To precisely pinpoint the cause of reactive power, our engineers did not start with assumptions, but with hard data. We position ourselves as an authority in Power Quality by thoroughly measuring before advising. Using sophisticated Power Quality Analyzers, we performed measurements on the descending fields to map the power flows within the installation in detail. In addition, a duration measurement was performed on the incoming power supply at the 10kV distribution station.
These measurements were not snapshots. We analysed the data over a representative period to get a full picture of load profiles and Cos φ. Our analysis showed conclusively where the losses occurred. By modelling this data, we could predict exactly what the impact of different solutions would be. This provided SNB with the technical certainty that the proposed intervention would address the problem at source, without risk to process continuity.
Based on the analysis, our engineers implemented the most technically effective solution: the installation of five correctly sized capacitor banks. We deliberately opted for an ‘internal upgrade’ approach. Rather than upgrading the infrastructure, we optimised the existing installation from within. Our engineers installed the capacitor banks strategically to compensate for reactive power immediately. This instantly improved the Cos φ of the incoming power supply to the desired level.
The impact of this intervention was immediately measurable. The plant became more stable and energy losses on the transformers decreased dramatically. HyTEPS took responsibility from design to completion, completely relieving the plant manager. With this decisive approach, we not only realised a technically sound installation, but also created the space for SNB to make optimal use of their sustainable energy sources without fear of grid congestion or fines.

SNB's case proves that capacity problems can often be solved without expensive grid reinforcements. Are you facing penalties for reactive power or want to optimise your installation? See how we also realised this for other partners.
HyTEPS
Beemdstraat 3
5653 MA Eindhoven
In an environment where tens of thousands of spectators count on continuity, downtime is not an option. HyTEPS secures Power Quality at Stadion Feijenoord, so that the transition to LED lighting leads directly to guaranteed performance without invisible risks.
HyTEPS eliminates harmonic pollution in the Ruhr Tunnel by implementing four active filters. Thanks to 40% spare capacity, technical safety for Rijkswaterstaat is guaranteed under all circumstances.
To prevent downtime at the new 5MW plant, HyTEPS preventively implemented two Active Harmonic Filters. This assures ARN Recycling of a stable energy network and maximum business continuity.
Our engineers performed specialist arc simulations to ensure the safety of InMotion's unique battery pack. Thanks to this concrete analysis, the team is now working on ultra-fast charging technology with the right protective equipment and complete certainty.
HyTEPS eliminated high-risk harmonic contamination at Nyrstar. Our specialist measurements provided an exact diagnosis and a guaranteed stable production environment.
HyTEPS solved the failure of air compressors at Mannesmann by immediately eliminating harmful harmonic contamination. With active filtering and continuous monitoring, precision tube production is now fully stabilised.
Harmonic contamination threatened the continuity of Schiphol's security lanes. HyTEPS analysed the risks and installed seven active filters to restore grid quality. The result is a stable installation and guaranteed operational security for millions of passengers.
Nijsen was struggling with high costs and lack of capacity due to reactive power. Our active capacitor banks eliminated the penalties and immediately created 550 amps of extra space on the transformers.
Van Munster Recyclers eliminated the reactive power penalty and immediately created additional capacity with a HyTEPS capacitor bank. Thanks to the immediate cost savings, this solution paid for itself within one year.
For iwell's battery system, HyTEPS conducted an Arc Flash Compliance study to ensure electrical safety. The new settings reduced shutdown times by 75%, reducing dangerous arc flash energy to safe levels.
By tackling unexplained outages with high-end monitoring, HyTEPS ensured continuity at Nyrstar. Real-time insight into Power Quality now prevents unnecessary downtime.
An independent Power Quality measurement at PLB Group exposed unused spare capacity. Through targeted optimisations, we avoided the purchase of an expensive battery storage system. This provides the customer with enormous cost savings, while maintaining security in every kilowatt.
HyTEPS increased installation capacity at Naber Plastics by targeting reactive power. With a 400kVAr capacitor bank, our engineers immediately created space for additional machinery. This results in optimum power utilisation and maximum operational reliability.
For absolute operational reliability of the Eastern Scheldt storm surge barrier, our engineers carried out a proactive Power Quality analysis on behalf of Heijmans. Through strategic measurements, we mapped the electrical installation, preventing potential problems and ensuring that this crucial Delta work is always ready.
HyTEPS implemented an advanced monitoring system that gives CurTec real-time grip on energy consumption and Power Quality. This data-driven solution prevents blind power penalties and ensures a stable, climate-neutral future.
Hospital Rivierenland ensures safe care by working with HyTEPS to eliminate harmonic contamination in the installation. The deployment of Active Harmonic Filters now guarantees optimum Power Quality and maximum operational reliability.
Conservation at Vencomatic inadvertently led to harmonic contamination and failure of critical equipment. After a proactive Power Quality measurement, our engineers implemented Active Harmonic Filters, which successfully stabilised the plant and ensured operational reliability.
HyTEPS ensures the operational reliability of Zentrys through targeted arc scanning and selectivity testing. With digital simulations, we eliminate invisible risks for maximum continuity and a safe working environment.
Our engineers analysed Power Quality with continuous waveform recording to ensure maximum safety. Thanks to continuous monitoring, all risks are now under control and care continuity is guaranteed.
By deploying a 300 kVA capacitor bank, HyTEPS stopped monthly reactive power penalties at VDL Parree. This intervention increased efficiency and created additional capacity immediately, so the investment paid for itself within a year.
HyTEPS ensures continuity at Clondalkin with a system that combines energy insight with automatic HACCP recording. This eliminates risky manual checks and maximises operational reliability.
HyTEPS integrated 4 MW of solar panels at KLM Schiphol without risk. By eliminating grid pollution with Active Harmonic Filters, we ensure maximum operational reliability and a stable installation in Hangar 14.
Thialf was struggling with unexplained failure of critical variable speed drives. HyTEPS implemented Active Harmonic Filters, which successfully reduced the harmonic pollution (THDu) present to below 4%. Supplemented by permanent monitoring, this now ensures an extremely stable and reliable installation.
Sappi Maastricht eliminated costly production downtime by targeting harmful harmonics with a Power Quality diagnosis and active filtering. This investment fully restored operational reliability and paid for itself within a year due to the guaranteed continuity.
Grid congestion and complex Power Quality issues threatened to stall OVET B.V.'s expansion plans. HyTEPS implemented an advanced monitoring system that provides exact insight into consumption and peaks. This allows OVET to safely expand and make maximum use of existing capacity without the risk of outages.
Strict EMC requirements in the vicinity of a transmission mast necessitated additional measures for a new solar park. Using continuous waveform recording, we mapped the emissions precisely. Thanks to this measurement report, ProfiNRG now has the data to implement targeted solutions.
HyTEPS eliminated electromagnetic interference in the Schiphol T2000 network after an integral EMC study. This approach restored system integrity and guaranteed uninterrupted communication for emergency services.
HyTEPS restored installation capacity at Xella by targeting reactive power with capacitor banks. The solution offers Xella an immediate cost reduction and sustainable security in every kilowatt.
HyTEPS continuously analyses and validates Power Quality data from the entire Dutch power grid. Our customised software transforms this complex data stream into reliable control information for optimal security of supply.
HyTEPS identified the risks to the taxiway lighting at Schiphol Airport through accurate measurements. With the subsequent solution, the continuity and safety of this critical installation is fully guaranteed.
HyTEPS eliminated years of cable insulation damage on the Bumblebee due to a hidden ground loop in the complex offshore installation through a focused Power Quality. This proactive approach restores operational continuity and provides Allseas with the maximum reliability their operation requires.
Despite own generation, SNB was struggling with high costs due to reactive power. HyTEPS optimised the installation with capacitor banks. The result: 1.75MW less grid load and a payback time within one year.
Through targeted measurements and active filtering, HyTEPS eliminated grid contamination and blind current penalties at Mauser Packaging Solutions . This immediately provided 500 amps of extra capacity, allowing production to scale up safely without investing in a heavier grid connection .