KLM's ambition to generate renewable energy on a large scale at Schiphol-East presents technical challenges. By installing 4 MW of PV panels on Hangar 14, KLM is opting for sustainability, but also for the need for impeccable Power Quality. Our engineers ensure that this green transition does not come at the expense of continuity at the airport.
At Amsterdam Airport Schiphol, downtime is not an option. Whilst the airport and KLM are achieving their environmental targets by fitting Hangar 14 with 4 MW of solar panels, this is creating a technical challenge. The inverters required for these renewable energy sources often introduce unwanted interference into the electricity grid. This leads to uncertainty regarding the efficiency and safety of critical electrical installations and the connected equipment.
Without proactive measures, these invisible power quality issues pose a direct risk to operational continuity. Production stoppages, accelerated wear and tear of components and unexplained faults are ever-present risks. KLM was therefore looking for a partner that would not only assess the current situation but also take full responsibility for delivering a technically reliable solution.

To determine the exact impact of the 4 MW PV installation, we conducted an in-depth analysis. Our engineers placed Power Quality analysers at strategic locations near several transformers. Using continuous waveform recording, we mapped the full consumption profile, power capacity and load of the hangar. This method enables us to capture every detail of the electrical voltage and current, ensuring that no anomaly goes unnoticed.
Data analysis showed that one of the transformers was suffering from high odd harmonics. This contamination, together with observed spikes caused by switching loads, posed a direct risk to grid stability. By translating these results into a clear diagnosis, we gave KLM the necessary insight into Power Quality aspects such as Total Harmonic Distortion (THD). This approach forms the foundation for a targeted solution that removes uncertainty and extends the lifetime of the installation.
Based on our measurements, we recommended the installation of Active Harmonic Filters (AHF). These systems respond instantly to fluctuating grid disturbances and eliminate the harmonic currents caused by the solar panels. Our engineers seamlessly integrated these filters into Hangar 14’s existing network. This enabled us to achieve an immediate reduction in grid distortion, ensuring that the installation now complies with the strictest standards and that operational reliability at Schiphol is guaranteed.
The result is a stable installation in which the negative effects of solar panels are completely neutralised. In addition to eliminating the risk of faults, the Active Harmonic Filter reduces reactive power consumption. This increases the available capacity of the transformers and prevents unnecessary penalties from the grid operator. Furthermore, we provided advice on reducing inrush currents and implementing ‘peak shaving’, enabling KLM to maximise the efficiency of its energy consumption.

Our approach at KLM proves that sustainability and reliable installation go hand in hand. By timely anticipating Power Quality risks, we prevent unplanned downtime and ensure the continuity of your critical processes. Want to know how we can optimise your installation?
HyTEPS
Beemdstraat 3
5653 MA Eindhoven
Harmonic contamination threatened the continuity of Schiphol's security lanes. HyTEPS analysed the risks and installed seven active filters to restore grid quality. The result is a stable installation and guaranteed operational security for millions of passengers.
An independent Power Quality measurement at PLB Group exposed unused spare capacity. Through targeted optimisations, we avoided the purchase of an expensive battery storage system. This provides the customer with enormous cost savings, while maintaining security in every kilowatt.
HyTEPS solved the failure of air compressors at Mannesmann by immediately eliminating harmful harmonic contamination. With active filtering and continuous monitoring, precision tube production is now fully stabilised.
Sappi Maastricht eliminated costly production downtime by targeting harmful harmonics with a Power Quality diagnosis and active filtering. This investment fully restored operational reliability and paid for itself within a year due to the guaranteed continuity.
HyTEPS increased installation capacity at Naber Plastics by targeting reactive power. With a 400kVAr capacitor bank, our engineers immediately created space for additional machinery. This results in optimum power utilisation and maximum operational reliability.
Our engineers performed specialist arc simulations to ensure the safety of InMotion's unique battery pack. Thanks to this concrete analysis, the team is now working on ultra-fast charging technology with the right protective equipment and complete certainty.
By tackling unexplained outages with high-end monitoring, HyTEPS ensured continuity at Nyrstar. Real-time insight into Power Quality now prevents unnecessary downtime.
HyTEPS eliminated high-risk harmonic contamination at Nyrstar. Our specialist measurements provided an exact diagnosis and a guaranteed stable production environment.
Our engineers analysed Power Quality with continuous waveform recording to ensure maximum safety. Thanks to continuous monitoring, all risks are now under control and care continuity is guaranteed.
Hospital Rivierenland ensures safe care by working with HyTEPS to eliminate harmonic contamination in the installation. The deployment of Active Harmonic Filters now guarantees optimum Power Quality and maximum operational reliability.
HyTEPS identified the risks to the taxiway lighting at Schiphol Airport through accurate measurements. With the subsequent solution, the continuity and safety of this critical installation is fully guaranteed.
To prevent downtime at the new 5MW plant, HyTEPS preventively implemented two Active Harmonic Filters. This assures ARN Recycling of a stable energy network and maximum business continuity.
HyTEPS restored installation capacity at Xella by targeting reactive power with capacitor banks. The solution offers Xella an immediate cost reduction and sustainable security in every kilowatt.
Strict EMC requirements in the vicinity of a transmission mast necessitated additional measures for a new solar park. Using continuous waveform recording, we mapped the emissions precisely. Thanks to this measurement report, ProfiNRG now has the data to implement targeted solutions.
HyTEPS ensures the operational reliability of Zentrys through targeted arc scanning and selectivity testing. With digital simulations, we eliminate invisible risks for maximum continuity and a safe working environment.
Through targeted measurements and active filtering, HyTEPS eliminated grid contamination and blind current penalties at Mauser Packaging Solutions . This immediately provided 500 amps of extra capacity, allowing production to scale up safely without investing in a heavier grid connection .
In an environment where tens of thousands of spectators count on continuity, downtime is not an option. HyTEPS secures Power Quality at Stadion Feijenoord, so that the transition to LED lighting leads directly to guaranteed performance without invisible risks.
HyTEPS eliminated electromagnetic interference in the Schiphol T2000 network after an integral EMC study. This approach restored system integrity and guaranteed uninterrupted communication for emergency services.
Conservation at Vencomatic inadvertently led to harmonic contamination and failure of critical equipment. After a proactive Power Quality measurement, our engineers implemented Active Harmonic Filters, which successfully stabilised the plant and ensured operational reliability.
By deploying a 300 kVA capacitor bank, HyTEPS stopped monthly reactive power penalties at VDL Parree. This intervention increased efficiency and created additional capacity immediately, so the investment paid for itself within a year.
Despite own generation, SNB was struggling with high costs due to reactive power. HyTEPS optimised the installation with capacitor banks. The result: 1.75MW less grid load and a payback time within one year.
HyTEPS eliminates harmonic pollution in the Ruhr Tunnel by implementing four active filters. Thanks to 40% spare capacity, technical safety for Rijkswaterstaat is guaranteed under all circumstances.
HyTEPS eliminated years of cable insulation damage on the Bumblebee due to a hidden ground loop in the complex offshore installation through a focused Power Quality. This proactive approach restores operational continuity and provides Allseas with the maximum reliability their operation requires.
Thialf was struggling with unexplained failure of critical variable speed drives. HyTEPS implemented Active Harmonic Filters, which successfully reduced the harmonic pollution (THDu) present to below 4%. Supplemented by permanent monitoring, this now ensures an extremely stable and reliable installation.
Nijsen was struggling with high costs and lack of capacity due to reactive power. Our active capacitor banks eliminated the penalties and immediately created 550 amps of extra space on the transformers.
Van Munster Recyclers eliminated the reactive power penalty and immediately created additional capacity with a HyTEPS capacitor bank. Thanks to the immediate cost savings, this solution paid for itself within one year.
Grid congestion and complex Power Quality issues threatened to stall OVET B.V.'s expansion plans. HyTEPS implemented an advanced monitoring system that provides exact insight into consumption and peaks. This allows OVET to safely expand and make maximum use of existing capacity without the risk of outages.
For iwell's battery system, HyTEPS conducted an Arc Flash Compliance study to ensure electrical safety. The new settings reduced shutdown times by 75%, reducing dangerous arc flash energy to safe levels.
HyTEPS integrated 4 MW of solar panels at KLM Schiphol without risk. By eliminating grid pollution with Active Harmonic Filters, we ensure maximum operational reliability and a stable installation in Hangar 14.
For absolute operational reliability of the Eastern Scheldt storm surge barrier, our engineers carried out a proactive Power Quality analysis on behalf of Heijmans. Through strategic measurements, we mapped the electrical installation, preventing potential problems and ensuring that this crucial Delta work is always ready.
HyTEPS implemented an advanced monitoring system that gives CurTec real-time grip on energy consumption and Power Quality. This data-driven solution prevents blind power penalties and ensures a stable, climate-neutral future.
HyTEPS ensures continuity at Clondalkin with a system that combines energy insight with automatic HACCP recording. This eliminates risky manual checks and maximises operational reliability.
HyTEPS continuously analyses and validates Power Quality data from the entire Dutch power grid. Our customised software transforms this complex data stream into reliable control information for optimal security of supply.