OVET B.V.: A precise overview of consumption and peaks
Grid congestion threatened to block the expansion plans.
Faults and outages
Power QualityIdentifying and resolving the causes of faultsEMCIdentifying faults in control and communication systemsReliable installationDiagnosis of critical functions and wear and tearCapacity and grid congestion
Grid congestionFreeing up capacity within your connectionEnergy Management (EMS)Active management within your power limitsEnergy transitionIntegrating solar panels, charging points and heat pumpsNot quite sure what the issue is? An engineer will work with you to find a solution.
View all solutionsA project can begin with any one of these four.
View all servicesWe understand the risks and standards specific to each sector.
View all sectorsWe supply and commission filters, compensation systems and measuring equipment.
View all productsArticles, white papers, sessions and training courses delivered by our engineers.
Open the knowledge baseWe have been working in the fields of power quality, EMC and energy flows since 2007.
Read about HyTEPSIndustry
Mauser in Oosterhout was paying monthly fines for reactive power and lacked sufficient power capacity for new machinery. Following measurements, HyTEPS installed filters at transformer level. This provided up to 500 A of additional capacity.

The Mauser Packaging Solutions production site in Oosterhout houses six transformers and a machine park comprising 20 blow moulding machines and 19 injection moulding machines. Reactive current resulted in monthly fines from the energy supplier. Harmonic distortion from certain controllers even spread to other main distribution boards.
Mauser wanted two things: to put an end to the fines and to free up power for new machinery, without having to go through a lengthy process to upgrade to a higher-capacity connection.
Our engineers carried out a comprehensive power quality measurement on 13 outgoing feeders, using continuous waveform recording. On a number of feeders, the harmonic power was found to be even higher than the reactive power. This indicates a heavy load on components and a greater risk of faults.
This provided a comprehensive overview of the entire installation, including the impact of harmonics on the transformers. These measurements formed the basis for the improvement plan.
HyTEPS installed harmonic filters at transformer level, so that the pollution is tackled at source. The filters neutralise harmonics and improve the power factor. In addition, power quality meters have been installed to continuously monitor the installation.
Reactive current penalties are a thing of the past, and the physical strain on the installation is reduced. Mauser can utilise up to 500 amps of additional capacity within the existing infrastructure.
Using the meters, Mauser can monitor consumption right down to the machine level. This enables the company to save energy by optimising the sizing of its processes.
HyTEPS immediately understood what we needed. They not only removed reactive power, but also freed up extra power, and made our power network healthier. We are now looking at how we can potentially release even more power by smart sizing.
Industry
Grid congestion threatened to block the expansion plans.
Industry
A new 5 MW installation was not to result in any outages.
Industry
Monthly fines avoided thanks to a 300 kVA capacitor bank.
Industry
400 kVAr capacitor bank to counteract reactive power.
Utility & Infra
Active harmonic filters for installation in Hangar 14.
Industry
Measurements revealed unused reserve capacity; a battery system proved unnecessary.
Industry
Elimination of reactive power penalties and additional capacity with a 150 kVA capacitor bank.
FMCG
Energy insights and automatic HACCP recording in a single system.
Industry
High costs due to reactive power, despite on-site generation.