Inefficient energy use was a brake on animal feed producer Nijsen's sustainable ambitions. Through technical optimisation, we eliminated reactive power penalties and immediately created space on the transformers for future growth.
Nijsen in Veulen has been processing residual streams from the food industry into high-quality animal feed for over 30 years. With two production facilities and its own solar farm, energy management is complex. However, the electrical installations consumed a disproportionate amount of 'reactive power'(reactive power). This is energy that loads the grid and transformer without being converted into useful work.
For technical managers and executives, this brought uncertainty. The inefficiency not only led to monthly fines on energy bills, but also snatched precious capacity from in-house transformers. This created the risk that future expansions would become impossible without heavy investment in infrastructure. HyTEPS was brought in to turn this invisible loss item into usable power.
"To reduce the risk of fines, Nijsen wanted to reduce the reactive power," he said.

To identify the exact cause of the capacity loss, our engineers carried out an in-depth Power Quality analysis in collaboration with Fudura. We mapped the energy flows of the main power supply and the solar farm in detail. The measurements showed that the Power Factor (the measure of efficiency) on the main distributors remained stuck at 0.76 and 0.79 respectively. A score far below the ideal value of 1.
This low Power Factor confirmed the presence of excessive inductive power. Our analysis showed that this reactive power unnecessarily loaded the transformers, resulting in high RMS currents. Based on this data and simulations, we designed a solution that not only combats the symptoms (penalties), but makes the installation fundamentally more efficient.
The advised proposals were implemented immediately: the new breaker 'trip' times have been reduced to 0.12s and 0.08s, where previously they were 0.48s and 0.27s. These reductions of 75% and 70% ensure shorter trip times, reducing energy levels during an arc while maintaining coordination between protective devices. This makes the cabinets safer and, in the event of an incident, the right device is always switched off correctly.
The results were immediately visible after commissioning. On the first main distributor, the Power Factor improved from 0.76 to 0.96 and the current draw dropped from 1150 A to 900 A. On the second distributor, we saw an improvement from 0.79 to 0.96, with a current reduction from 1350 A to 950 A. In total, this achieved over 550 Amps of 'free' space on the transformers. The plant is now stable, efficient and ready for expansion.



An efficient installation means lower costs and greater operational reliability. Are you running up against your contract power limits or paying penalties for blind current? Our engineers offer the solution.
HyTEPS
Beemdstraat 3
5653 MA Eindhoven
HyTEPS restored installation capacity at Xella by targeting reactive power with capacitor banks. The solution offers Xella an immediate cost reduction and sustainable security in every kilowatt.
HyTEPS eliminates harmonic pollution in the Ruhr Tunnel by implementing four active filters. Thanks to 40% spare capacity, technical safety for Rijkswaterstaat is guaranteed under all circumstances.
An independent Power Quality measurement at PLB Group exposed unused spare capacity. Through targeted optimisations, we avoided the purchase of an expensive battery storage system. This provides the customer with enormous cost savings, while maintaining security in every kilowatt.
Grid congestion and complex Power Quality issues threatened to stall OVET B.V.'s expansion plans. HyTEPS implemented an advanced monitoring system that provides exact insight into consumption and peaks. This allows OVET to safely expand and make maximum use of existing capacity without the risk of outages.
HyTEPS ensures continuity at Clondalkin with a system that combines energy insight with automatic HACCP recording. This eliminates risky manual checks and maximises operational reliability.
Thialf was struggling with unexplained failure of critical variable speed drives. HyTEPS implemented Active Harmonic Filters, which successfully reduced the harmonic pollution (THDu) present to below 4%. Supplemented by permanent monitoring, this now ensures an extremely stable and reliable installation.
By deploying a 300 kVA capacitor bank, HyTEPS stopped monthly reactive power penalties at VDL Parree. This intervention increased efficiency and created additional capacity immediately, so the investment paid for itself within a year.
HyTEPS ensures the operational reliability of Zentrys through targeted arc scanning and selectivity testing. With digital simulations, we eliminate invisible risks for maximum continuity and a safe working environment.
Through targeted measurements and active filtering, HyTEPS eliminated grid contamination and blind current penalties at Mauser Packaging Solutions . This immediately provided 500 amps of extra capacity, allowing production to scale up safely without investing in a heavier grid connection .
HyTEPS continuously analyses and validates Power Quality data from the entire Dutch power grid. Our customised software transforms this complex data stream into reliable control information for optimal security of supply.
HyTEPS solved the failure of air compressors at Mannesmann by immediately eliminating harmful harmonic contamination. With active filtering and continuous monitoring, precision tube production is now fully stabilised.
By tackling unexplained outages with high-end monitoring, HyTEPS ensured continuity at Nyrstar. Real-time insight into Power Quality now prevents unnecessary downtime.
Harmonic contamination threatened the continuity of Schiphol's security lanes. HyTEPS analysed the risks and installed seven active filters to restore grid quality. The result is a stable installation and guaranteed operational security for millions of passengers.
Despite own generation, SNB was struggling with high costs due to reactive power. HyTEPS optimised the installation with capacitor banks. The result: 1.75MW less grid load and a payback time within one year.
Conservation at Vencomatic inadvertently led to harmonic contamination and failure of critical equipment. After a proactive Power Quality measurement, our engineers implemented Active Harmonic Filters, which successfully stabilised the plant and ensured operational reliability.
Van Munster Recyclers eliminated the reactive power penalty and immediately created additional capacity with a HyTEPS capacitor bank. Thanks to the immediate cost savings, this solution paid for itself within one year.
HyTEPS eliminated electromagnetic interference in the Schiphol T2000 network after an integral EMC study. This approach restored system integrity and guaranteed uninterrupted communication for emergency services.
Nijsen was struggling with high costs and lack of capacity due to reactive power. Our active capacitor banks eliminated the penalties and immediately created 550 amps of extra space on the transformers.
HyTEPS implemented an advanced monitoring system that gives CurTec real-time grip on energy consumption and Power Quality. This data-driven solution prevents blind power penalties and ensures a stable, climate-neutral future.
To prevent downtime at the new 5MW plant, HyTEPS preventively implemented two Active Harmonic Filters. This assures ARN Recycling of a stable energy network and maximum business continuity.
For iwell's battery system, HyTEPS conducted an Arc Flash Compliance study to ensure electrical safety. The new settings reduced shutdown times by 75%, reducing dangerous arc flash energy to safe levels.
HyTEPS integrated 4 MW of solar panels at KLM Schiphol without risk. By eliminating grid pollution with Active Harmonic Filters, we ensure maximum operational reliability and a stable installation in Hangar 14.
In an environment where tens of thousands of spectators count on continuity, downtime is not an option. HyTEPS secures Power Quality at Stadion Feijenoord, so that the transition to LED lighting leads directly to guaranteed performance without invisible risks.
HyTEPS eliminated years of cable insulation damage on the Bumblebee due to a hidden ground loop in the complex offshore installation through a focused Power Quality. This proactive approach restores operational continuity and provides Allseas with the maximum reliability their operation requires.
Sappi Maastricht eliminated costly production downtime by targeting harmful harmonics with a Power Quality diagnosis and active filtering. This investment fully restored operational reliability and paid for itself within a year due to the guaranteed continuity.
For absolute operational reliability of the Eastern Scheldt storm surge barrier, our engineers carried out a proactive Power Quality analysis on behalf of Heijmans. Through strategic measurements, we mapped the electrical installation, preventing potential problems and ensuring that this crucial Delta work is always ready.
HyTEPS eliminated high-risk harmonic contamination at Nyrstar. Our specialist measurements provided an exact diagnosis and a guaranteed stable production environment.
Our engineers analysed Power Quality with continuous waveform recording to ensure maximum safety. Thanks to continuous monitoring, all risks are now under control and care continuity is guaranteed.
HyTEPS identified the risks to the taxiway lighting at Schiphol Airport through accurate measurements. With the subsequent solution, the continuity and safety of this critical installation is fully guaranteed.
Our engineers performed specialist arc simulations to ensure the safety of InMotion's unique battery pack. Thanks to this concrete analysis, the team is now working on ultra-fast charging technology with the right protective equipment and complete certainty.
Hospital Rivierenland ensures safe care by working with HyTEPS to eliminate harmonic contamination in the installation. The deployment of Active Harmonic Filters now guarantees optimum Power Quality and maximum operational reliability.
HyTEPS increased installation capacity at Naber Plastics by targeting reactive power. With a 400kVAr capacitor bank, our engineers immediately created space for additional machinery. This results in optimum power utilisation and maximum operational reliability.