Industry
VDL Parree: Payback within a year
Monthly fines avoided thanks to a 300 kVA capacitor bank.
Faults and outages
Power QualityIdentifying and resolving the causes of faultsEMCIdentifying faults in control and communication systemsReliable installationDiagnosis of critical functions and wear and tearCapacity and grid congestion
Grid congestionFreeing up capacity within your connectionEnergy Management (EMS)Active management within your power limitsEnergy transitionIntegrating solar panels, charging points and heat pumpsNot quite sure what the issue is? An engineer will work with you to find a solution.
View all solutionsA project can begin with any one of these four.
View all servicesWe understand the risks and standards specific to each sector.
View all sectorsWe supply and commission filters, compensation systems and measuring equipment.
View all productsArticles, white papers, sessions and training courses delivered by our engineers.
Open the knowledge baseWe have been working in the fields of power quality, EMC and energy flows since 2007.
Read about HyTEPSIndustry
Naber Plastics wanted to connect an additional machine, but the transformers were at full capacity. The cause was reactive power. A 400 kVAr capacitor bank from HyTEPS created space for additional machinery.

Naber Plastics B.V. is a family-run business in the plastic injection moulding industry. Energy efficiency is a key consideration in every investment. When the company wanted to connect an additional machine, it came up against a limitation: the transformers were operating at maximum capacity.
Without intervention, further growth would have been impossible, or only possible through a costly upgrade of the grid connection.
Using a power quality measurement, our engineers mapped out the energy flows and the quality of the grid at the production site.
The analysis showed that the transformers were being pushed to their maximum capacity due to an excessively low cos phi. Reactive power was taking up the capacity needed for growth.
HyTEPS supplied and installed a 400 kVAr capacitor bank, sized to meet Naber Plastics’ requirements. The existing injection moulding processes were not disrupted during the installation.
The transformers are once again being utilised to their full potential and transmission losses are kept to a minimum. Naber Plastics now has space for additional machinery; growth is no longer constrained by the installation.
HyTEPS interpreted our request well and provided optimal support in the process. The delivery of the capacitor bank went smoothly and the given expected results came true.
Industry
Monthly fines avoided thanks to a 300 kVA capacitor bank.
Industry
Elimination of reactive power penalties and additional capacity with a 150 kVA capacitor bank.
Industry
A new 5 MW installation was not to result in any outages.
FMCG
Energy insights and automatic HACCP recording in a single system.
Industry
Grid congestion threatened to block the expansion plans.
Industry
High costs due to reactive power, despite on-site generation.
Industry
Measurements revealed unused reserve capacity; a battery system proved unnecessary.
Industry
No need for a higher-capacity grid connection to scale up production.
FMCG
Penalties and capacity shortages caused by reactive power.
You’ll receive a reply within one working day. Your first consultation will be with an engineer.