Industry
SNB: 1.75 MW reduction in grid load
High costs due to reactive power, despite on-site generation.
Faults and outages
Power QualityIdentifying and resolving the causes of faultsEMCIdentifying faults in control and communication systemsReliable installationDiagnosis of critical functions and wear and tearCapacity and grid congestion
Grid congestionFreeing up capacity within your connectionEnergy Management (EMS)Active management within your power limitsEnergy transitionIntegrating solar panels, charging points and heat pumpsNot quite sure what the issue is? An engineer will work with you to find a solution.
View all solutionsA project can begin with any one of these four.
View all servicesWe understand the risks and standards specific to each sector.
View all sectorsWe supply and commission filters, compensation systems and measuring equipment.
View all productsArticles, white papers, sessions and training courses delivered by our engineers.
Open the knowledge baseWe have been working in the fields of power quality, EMC and energy flows since 2007.
Read about HyTEPSIndustry
Van Munster Recyclers used to pay a reactive power penalty every month. Following measurements, HyTEPS installed a 150 kVA capacitor bank. The penalty has been eliminated, there is extra capacity, and the investment paid for itself within a year.

Van Munster Recyclers processes large quantities of cardboard, paper, metal and plastic. This process generated a significant amount of reactive power. This resulted in unnecessary energy losses and a monthly penalty from the grid operator under the heading ‘reactive power consumption charges’.
Rising costs and the desire to reduce environmental impact prompted an analysis.
Our engineers measured the level of reactive power and harmonic distortion. This revealed the impact of the recycling processes on the grid.
The transformer was found to be under an unnecessarily heavy load due to the transmission of reactive power. This limited the capacity available for the company’s own operational processes.
HyTEPS installed a 150 kVA capacitor bank with protection against harmonic distortion. This compensates for reactive power on-site, ensuring that the transformer now only transmits active power.
The monthly reactive power penalty has been immediately removed from the electricity bill. This has created additional installation capacity within the existing infrastructure. The investment paid for itself within a year.
One year after commissioning the HyTEPS capacitor bank, we note that no 'blind power penalty' was paid after installation and that the capacitor bank has already almost paid for itself.
Industry
High costs due to reactive power, despite on-site generation.
Utility & Infra
Active harmonic filters for installation in Hangar 14.
Industry
Reactive power addressed using capacitor banks.
FMCG
Energy insights and automatic HACCP recording in a single system.
Industry
Measurements revealed unused reserve capacity; a battery system proved unnecessary.
Industry
Grid congestion threatened to block the expansion plans.
Industry
No need for a higher-capacity grid connection to scale up production.
Industry
Monthly fines avoided thanks to a 300 kVA capacitor bank.
Industry
400 kVAr capacitor bank to counteract reactive power.
You’ll receive a reply within one working day. Your first consultation will be with an engineer.