Utility & Infra
Heijmans: 10kV installation assessed for risks
Power quality analysis of the Oosterschelde storm surge barrier, commissioned by Heijmans.
Faults and outages
Power QualityIdentifying and resolving the causes of faultsEMCIdentifying faults in control and communication systemsReliable installationDiagnosis of critical functions and wear and tearCapacity and grid congestion
Grid congestionFreeing up capacity within your connectionEnergy Management (EMS)Active management within your power limitsEnergy transitionIntegrating solar panels, charging points and heat pumpsNot quite sure what the issue is? An engineer will work with you to find a solution.
View all solutionsA project can begin with any one of these four.
View all servicesWe understand the risks and standards specific to each sector.
View all sectorsWe supply and commission filters, compensation systems and measuring equipment.
View all productsArticles, white papers, sessions and training courses delivered by our engineers.
Open the knowledge baseWe have been working in the fields of power quality, EMC and energy flows since 2007.
Read about HyTEPSUtilities & Infrastructure
Feijenoord Stadium is switching to LED lighting in the floodlight masts and along the roof edge. HyTEPS measured the installation during a match, simulated the new luminaires and verified the results with a validation measurement.

Feijenoord Stadium is switching to LED lighting in the four floodlight masts and along the roof edge. LED luminaires last longer and use less energy, but they also present certain challenges during installation.
Large numbers of LED drivers can cause harmonic distortion, high inrush currents and an unforeseen load on the neutral conductor. As well as football matches, De Kuip also hosts concerts and conferences. Any outage during a live broadcast would have significant financial consequences.
Our engineers carried out a baseline measurement during a match, as the installation only reveals how power quality behaves under full load. Everything was recorded using continuous waveform recording. This data formed the basis for a simulation model.
In this model, the characteristics of the new luminaires have been analysed, such as harmonic current and inrush currents. EMC and supraharmonics have also been investigated to ensure that protective devices do not trip unnecessarily.
Based on the analysis, the installation was modified. A key aspect was reducing the voltage, in consultation with the network operator, to ensure it met the requirements of the new luminaires. The installation was monitored throughout the works.
The final validation measurement shows that the installation is performing as designed. Feijenoord Stadium now has a validated model and a final report. The risk of faults is low.
Utility & Infra
Power quality analysis of the Oosterschelde storm surge barrier, commissioned by Heijmans.
Healthcare
First, detailed measurements are taken, followed by continuous monitoring within the hospital.
Utility & Infra
Precise measurements identified the risks associated with this critical installation.
Industry
Specialist measurements at a zinc plant with currents of up to 77,000 A.
FMCG
Production downtime caused by harmonics, addressed through diagnosis and active filtering.
Industry
Harmonic distortion in the production of precision tubes.
Healthcare
Active harmonic filters in the hospital’s electrical installation.
Utility & Infra
Harmonic distortion was threatening the security lanes.
Utility & Infra
EMC study for emergency services communications.
You’ll receive a reply within one working day. Your first consultation will be with an engineer.