Data centre

Zentrys: Arc scan and selectivity analysis

The Zentrys data centre in Groningen must operate round the clock. HyTEPS created a digital model of the installation, carried out an arc flash scan and selectivity analysis, and provided advice on the settings of the circuit breakers.

Client
Zentrys, Groningen
What happened
Concerns about selectivity and safety
What we did
Arc scan and selectivity analysis
Result
Only the affected segment is switched off

The background

For Zentrys, a stable power supply is fundamental. Hospitals, emergency services and financial institutions rely on the availability of their servers. Connected equipment can cause power quality to deteriorate without being noticed.

Zentrys wanted assurance regarding the selectivity and safety of the installation in Groningen. Without proper coordination, a minor fault could lead to large parts of the data centre suffering unnecessary outages.

The diagnosis

Our engineers carried out an on-site survey of the installation and converted this into a detailed digital model. This was used to simulate scenarios and identify energy levels and potential hazards.

The calculations demonstrated how arcing affects short-circuit currents. This highlighted where the current settings of the protective devices were falling short.

The solution

Based on the simulations, HyTEPS advised on the configuration of the circuit breakers. The arc flash scan provides staff with clarity on the personal protective equipment (PPE) they require during maintenance work.

The result

Only the affected segment is switched off

In the event of a fault, only the affected segment shuts down; the rest of the data centre continues to operate. The installation complies with NEN 3140 and NEN 1010, and workplace safety has been improved.

Used in this project

The nice thing about working with HyTEPS is that you can dive very deep into the subject matter and thus achieve good results together. I personally find that very pleasant.

Kees Loerpartner and co-owner

Similar projects

See all projects

Have your installation assessed by an engineer

You’ll receive a reply within one working day. Your first consultation will be with an engineer.