Unexplained failure of rectifiers posed a risk to process continuity at zinc producer Nyrstar. Thanks to HyTEPS' implementation of advanced monitoring, the cause is now always visible and operational reliability guaranteed. We brought peace of mind back to the plant.
As the only zinc producer in the Netherlands, Nyrstar bears responsibility for an annual production of approximately 290,000 tonnes of high-quality zinc. In a process of this size, continuity is not a wish but a hard requirement. Yet the organisation was faced with a technical conundrum: the inexplicable, short-term failure of rectifiers with thyristors. For the technical managers and plant managers, this not only posed production risks, but also the gnawing uncertainty about the cause. Was it wear and tear? An internal fault? Or did the problem lie deeper in the plant's power supply?
This uncertainty is disastrous for a production environment where safety and reliability are paramount. During the internal investigation, it was suspected that the quality of electricity - Power Quality - played a role at the time of failure. Because regular measuring equipment is often not fast enough to capture momentary events, the 'smoking gun' remained invisible. Patrick Emmers, Reliability Engineer E&I at Nyrstar, clearly articulates the move towards certainty:
"When the word Power Quality came up, we immediately approached HyTEPS, our in-house supplier in the field of Power Quality."

To restore operational reliability, it is not enough to simply look at the voltage; an in-depth Power Quality analysis is necessary. HyTEPS analysed the situation and recommended the deployment of the SATEC EM720T. This is not just any meter, but an advanced instrument capable of recording all possible Power Quality events at lightning speed. Where standard meters fail, this technology brings transients, peaks, dips, flicker and harmonics into razor-sharp focus.
HyTEPS' strategy rests on facts and data. Our engineers recommended the placement of four of these meters, specifically positioned on each of NYRSTAR's 10 kV supply lines. In doing so, we created a conclusive measurement network that does not miss a single anomaly. By deploying this technical expertise, we transformed a vague suspicion of 'bad power' into a concrete, measurable parameter set. This enables Nyrstar to see exactly what the status of the power supply was at the millisecond a thyristor failed.
At HyTEPS, responsibility does not stop with the delivery of a box; we ensure its operation in practice. Our engineers configured the meters and associated software in close cooperation with the team at NYRSTAR. This decisive implementation ensures that the data is not only collected but also directly usable by the people on the floor. The objective was clear: the customer must be able to act independently and immediately in case of calamities.
The result is total control. This eliminates guesswork. HyTEPS has thus drastically reduced the search area for the cause of outages. Moreover, the analyses now provide insight into long-term trends, allowing NYRSTAR to proactively maintain before an incident occurs.

Like Nyrstar, you can eliminate downtime risks through insight. Don't wait until a failure shuts down your process. Our specialists are ready to analyse and protect your installation.
HyTEPS
Beemdstraat 3
5653 MA Eindhoven
HyTEPS eliminated years of cable insulation damage on the Bumblebee due to a hidden ground loop in the complex offshore installation through a focused Power Quality. This proactive approach restores operational continuity and provides Allseas with the maximum reliability their operation requires.
Sappi Maastricht eliminated costly production downtime by targeting harmful harmonics with a Power Quality diagnosis and active filtering. This investment fully restored operational reliability and paid for itself within a year due to the guaranteed continuity.
Nijsen was struggling with high costs and lack of capacity due to reactive power. Our active capacitor banks eliminated the penalties and immediately created 550 amps of extra space on the transformers.
Our engineers analysed Power Quality with continuous waveform recording to ensure maximum safety. Thanks to continuous monitoring, all risks are now under control and care continuity is guaranteed.
Grid congestion and complex Power Quality issues threatened to stall OVET B.V.'s expansion plans. HyTEPS implemented an advanced monitoring system that provides exact insight into consumption and peaks. This allows OVET to safely expand and make maximum use of existing capacity without the risk of outages.
Thialf was struggling with unexplained failure of critical variable speed drives. HyTEPS implemented Active Harmonic Filters, which successfully reduced the harmonic pollution (THDu) present to below 4%. Supplemented by permanent monitoring, this now ensures an extremely stable and reliable installation.
HyTEPS identified the risks to the taxiway lighting at Schiphol Airport through accurate measurements. With the subsequent solution, the continuity and safety of this critical installation is fully guaranteed.
HyTEPS eliminates harmonic pollution in the Ruhr Tunnel by implementing four active filters. Thanks to 40% spare capacity, technical safety for Rijkswaterstaat is guaranteed under all circumstances.
HyTEPS restored installation capacity at Xella by targeting reactive power with capacitor banks. The solution offers Xella an immediate cost reduction and sustainable security in every kilowatt.
An independent Power Quality measurement at PLB Group exposed unused spare capacity. Through targeted optimisations, we avoided the purchase of an expensive battery storage system. This provides the customer with enormous cost savings, while maintaining security in every kilowatt.
In an environment where tens of thousands of spectators count on continuity, downtime is not an option. HyTEPS secures Power Quality at Stadion Feijenoord, so that the transition to LED lighting leads directly to guaranteed performance without invisible risks.
HyTEPS increased installation capacity at Naber Plastics by targeting reactive power. With a 400kVAr capacitor bank, our engineers immediately created space for additional machinery. This results in optimum power utilisation and maximum operational reliability.
Through targeted measurements and active filtering, HyTEPS eliminated grid contamination and blind current penalties at Mauser Packaging Solutions . This immediately provided 500 amps of extra capacity, allowing production to scale up safely without investing in a heavier grid connection .
By tackling unexplained outages with high-end monitoring, HyTEPS ensured continuity at Nyrstar. Real-time insight into Power Quality now prevents unnecessary downtime.
Hospital Rivierenland ensures safe care by working with HyTEPS to eliminate harmonic contamination in the installation. The deployment of Active Harmonic Filters now guarantees optimum Power Quality and maximum operational reliability.
Despite own generation, SNB was struggling with high costs due to reactive power. HyTEPS optimised the installation with capacitor banks. The result: 1.75MW less grid load and a payback time within one year.
Harmonic contamination threatened the continuity of Schiphol's security lanes. HyTEPS analysed the risks and installed seven active filters to restore grid quality. The result is a stable installation and guaranteed operational security for millions of passengers.
For absolute operational reliability of the Eastern Scheldt storm surge barrier, our engineers carried out a proactive Power Quality analysis on behalf of Heijmans. Through strategic measurements, we mapped the electrical installation, preventing potential problems and ensuring that this crucial Delta work is always ready.
HyTEPS continuously analyses and validates Power Quality data from the entire Dutch power grid. Our customised software transforms this complex data stream into reliable control information for optimal security of supply.
HyTEPS eliminated high-risk harmonic contamination at Nyrstar. Our specialist measurements provided an exact diagnosis and a guaranteed stable production environment.
Van Munster Recyclers eliminated the reactive power penalty and immediately created additional capacity with a HyTEPS capacitor bank. Thanks to the immediate cost savings, this solution paid for itself within one year.
Our engineers performed specialist arc simulations to ensure the safety of InMotion's unique battery pack. Thanks to this concrete analysis, the team is now working on ultra-fast charging technology with the right protective equipment and complete certainty.
HyTEPS ensures continuity at Clondalkin with a system that combines energy insight with automatic HACCP recording. This eliminates risky manual checks and maximises operational reliability.
HyTEPS solved the failure of air compressors at Mannesmann by immediately eliminating harmful harmonic contamination. With active filtering and continuous monitoring, precision tube production is now fully stabilised.
HyTEPS integrated 4 MW of solar panels at KLM Schiphol without risk. By eliminating grid pollution with Active Harmonic Filters, we ensure maximum operational reliability and a stable installation in Hangar 14.
HyTEPS eliminated electromagnetic interference in the Schiphol T2000 network after an integral EMC study. This approach restored system integrity and guaranteed uninterrupted communication for emergency services.
Conservation at Vencomatic inadvertently led to harmonic contamination and failure of critical equipment. After a proactive Power Quality measurement, our engineers implemented Active Harmonic Filters, which successfully stabilised the plant and ensured operational reliability.
By deploying a 300 kVA capacitor bank, HyTEPS stopped monthly reactive power penalties at VDL Parree. This intervention increased efficiency and created additional capacity immediately, so the investment paid for itself within a year.
For iwell's battery system, HyTEPS conducted an Arc Flash Compliance study to ensure electrical safety. The new settings reduced shutdown times by 75%, reducing dangerous arc flash energy to safe levels.
HyTEPS implemented an advanced monitoring system that gives CurTec real-time grip on energy consumption and Power Quality. This data-driven solution prevents blind power penalties and ensures a stable, climate-neutral future.
To prevent downtime at the new 5MW plant, HyTEPS preventively implemented two Active Harmonic Filters. This assures ARN Recycling of a stable energy network and maximum business continuity.
HyTEPS ensures the operational reliability of Zentrys through targeted arc scanning and selectivity testing. With digital simulations, we eliminate invisible risks for maximum continuity and a safe working environment.