Invisible harmonic contamination at Nyrstar posed a direct risk to the plant's operational reliability and technical service life. Our engineers identified the exact source of the contamination through in-depth Power Quality measurements and specialist analysis. By eliminating these risks, we now offer Nyrstar the guarantee of a stable plant and absolute security in every kilowatt.
Nyrstar Budel B.V. is the only zinc producer in the Netherlands responsible for a continuous production process of 290,000 tonnes of zinc per year. In this metallurgical-chemical process, zinc ore is processed via electrolysis, a procedure that requires huge currents of up to 77,000 amps per circuit.
To control these powers, installations use rectifiers. These components are essential, but at the same time are the source of heavy harmonic pollution. For Nico Hendrix, Sr. Project Engineer E&I, the impact was clear: the pollution led to unexplained failures and faulty equipment elsewhere in the grid. Uncertainty about the quality of the voltage supplied and the mutual influence of installation parts was a risk that had to be eliminated.

Our approach started with an in-depth analysis of the complex electrical infrastructure. To ensure technical authority, our engineers carried out extensive measurements at strategic points within the installation. In doing so, we used state-of-the-art equipment for accurate recording of all parameters.
By deploying specialised Power Quality measurements, we gained precise insight into harmonic currents and voltage distortion. These data formed the basis for our simulations and modelling. This allowed us not only to determine the current status, but also to predict future scenarios and the impact on the installation. The technical proposition was fully supported by actual data, in line with IEC standards.
Our engineers recommended connecting the filters directly to the medium voltage. This effectively tackles pollution at the source before it can spread through the rest of the installation. The result is a "clean" sine wave and a drastically reduced risk of failure of critical assets.
In this new world, Nyrstar enjoys plant stability. HyTEPS' proactive approach has minimised the risks of premature component obsolescence and unexplained failures. We took full responsibility from initial diagnosis to final delivery, resulting in peace of mind and certainty for the technical staff.

At Nyrstar, it is proven that insight leads to stability. Don't let harmonic contamination disrupt your production process. Our experts provide the diagnosis and solution that gives you peace of mind.
HyTEPS
Beemdstraat 3
5653 MA Eindhoven
Nijsen was struggling with high costs and lack of capacity due to reactive power. Our active capacitor banks eliminated the penalties and immediately created 550 amps of extra space on the transformers.
To prevent downtime at the new 5MW plant, HyTEPS preventively implemented two Active Harmonic Filters. This assures ARN Recycling of a stable energy network and maximum business continuity.
Despite own generation, SNB was struggling with high costs due to reactive power. HyTEPS optimised the installation with capacitor banks. The result: 1.75MW less grid load and a payback time within one year.
By tackling unexplained outages with high-end monitoring, HyTEPS ensured continuity at Nyrstar. Real-time insight into Power Quality now prevents unnecessary downtime.
Grid congestion and complex power quality issues threatened to stall OVET's expansion plans. HyTEPS implemented an advanced monitoring system that provides precise insight into consumption and peaks. This allows OVET to safely expand and make maximum use of existing capacity without the risk of outages.
Harmonic contamination threatened the continuity of Schiphol's security lanes. HyTEPS analysed the risks and installed seven active filters to restore grid quality. The result is a stable installation and guaranteed operational security for millions of passengers.
An independent Power Quality measurement at PLB Group exposed unused spare capacity. Through targeted optimisations, we avoided the purchase of an expensive battery storage system. This provides the customer with enormous cost savings, while maintaining security in every kilowatt.
HyTEPS restored installation capacity at Xella by targeting reactive power with capacitor banks. The solution offers Xella an immediate cost reduction and sustainable security in every kilowatt.
HyTEPS increased installation capacity at Naber Plastics by targeting reactive power. With a 400kVAr capacitor bank, our engineers immediately created space for additional machinery. This results in optimum power utilisation and maximum operational reliability.
HyTEPS ensures the operational reliability of Zentrys through targeted arc scanning and selectivity testing. With digital simulations, we eliminate invisible risks for maximum continuity and a safe working environment.
HyTEPS eliminated years of cable insulation damage on the Bumblebee due to a hidden ground loop in the complex offshore installation through a focused Power Quality. This proactive approach restores operational continuity and provides Allseas with the maximum reliability their operation requires.
Sappi Maastricht eliminated costly production downtime by targeting harmful harmonics with a Power Quality diagnosis and active filtering. This investment fully restored operational reliability and paid for itself within a year due to the guaranteed continuity.
In an environment where tens of thousands of spectators count on continuity, downtime is not an option. HyTEPS secures Power Quality at Stadion Feijenoord, so that the transition to LED lighting leads directly to guaranteed performance without invisible risks.
Through targeted measurements and active filtering, HyTEPS eliminated grid contamination and blind current penalties at Mauser Packaging Solutions . This immediately provided 500 amps of extra capacity, allowing production to scale up safely without investing in a heavier grid connection .
HyTEPS integrated 4 MW of solar panels at KLM Schiphol without risk. By eliminating grid pollution with Active Harmonic Filters, we ensure maximum operational reliability and a stable installation in Hangar 14.
By deploying a 300 kVA capacitor bank, HyTEPS stopped monthly reactive power penalties at VDL Parree. This intervention increased efficiency and created additional capacity immediately, so the investment paid for itself within a year.
Van Munster Recyclers eliminated the reactive power penalty and immediately created additional capacity with a HyTEPS capacitor bank. Thanks to the immediate cost savings, this solution paid for itself within one year.
HyTEPS ensures continuity at Clondalkin with a system that combines energy insight with automatic HACCP recording. This eliminates risky manual checks and maximises operational reliability.
Hospital Rivierenland ensures safe care by working with HyTEPS to eliminate harmonic contamination in the installation. The deployment of Active Harmonic Filters now guarantees optimum Power Quality and maximum operational reliability.
HyTEPS implemented an advanced monitoring system that gives CurTec real-time grip on energy consumption and Power Quality. This data-driven solution prevents blind power penalties and ensures a stable, climate-neutral future.
HyTEPS identified the risks to the taxiway lighting at Schiphol Airport through accurate measurements. With the subsequent solution, the continuity and safety of this critical installation is fully guaranteed.
Our engineers performed specialist arc simulations to ensure the safety of InMotion's unique battery pack. Thanks to this concrete analysis, the team is now working on ultra-fast charging technology with the right protective equipment and complete certainty.
HyTEPS eliminates harmonic pollution in the Ruhr Tunnel by implementing four active filters. Thanks to 40% spare capacity, technical safety for Rijkswaterstaat is guaranteed under all circumstances.
Our engineers analysed Power Quality with continuous waveform recording to ensure maximum safety. Thanks to continuous monitoring, all risks are now under control and care continuity is guaranteed.
HyTEPS continuously analyses and validates Power Quality data from the entire Dutch power grid. Our customised software transforms this complex data stream into reliable control information for optimal security of supply.
HyTEPS eliminated electromagnetic interference in the Schiphol T2000 network after an integral EMC study. This approach restored system integrity and guaranteed uninterrupted communication for emergency services.
HyTEPS eliminated high-risk harmonic contamination at Nyrstar. Our specialist measurements provided an exact diagnosis and a guaranteed stable production environment.
HyTEPS solved the failure of air compressors at Mannesmann by immediately eliminating harmful harmonic contamination. With active filtering and continuous monitoring, precision tube production is now fully stabilised.
For iwell's battery system, HyTEPS conducted an Arc Flash Compliance study to ensure electrical safety. The new settings reduced shutdown times by 75%, reducing dangerous arc flash energy to safe levels.